Defined selection basis
Published reference ratings give engineering and procurement teams a clear starting point for technical comparison.
Metering and outdoor distribution
ML-MME400Indoor multi-position metering enclosure for low-voltage multi-user distribution.
1 / 2Reference product views - final lineup follows approved project documents.
For controlled power distribution
ML-MME400 organizes multi-user energy metering within a metal enclosure. Meter positions, incoming arrangement, outgoing circuits and utility interfaces are configured for the approved distribution scheme.
Customer benefits
Benefits are expressed around the engineering and project workflow, with product claims kept tied to the documented reference.
Published reference ratings give engineering and procurement teams a clear starting point for technical comparison.
Busbar, protection, interfaces and panel arrangement are confirmed against the approved single-line diagram and project documents.
Available test and conformity evidence available is reviewed against the offered model, rating and construction before submission.
Approved drawings, inspection records and final documents are organized around the released project configuration.
Technical data
Published values are catalogue references. The offered configuration is confirmed against the approved single-line diagram, data sheets and project interfaces.
Outline and dimensions
12-position reference enclosure: 1166 W x 180 D x 1000 H mm
Final dimensions are subject to the approved general arrangement.Find out more
Use published documents for preliminary review. Applicability to a project offer is confirmed during technical clarification.
Product questions
The page lists the catalogue reference configuration for ML-MME400. Final ratings and interfaces remain subject to the approved project documents.
No. The dimensions are a documented reference envelope. Final width, depth, height and lineup arrangement depend on the selected devices, ratings, cable interfaces and approved general arrangement.
Test and conformity evidence available can be reviewed for applicability to the offered model and configuration. Project-specific routine verification is handled separately during manufacturing and release.
Project-specific review